Phase 2 Construction Project for the Arroyo del Rey Pumping Station
Details
The project was launched as a strategic response to the pressing need to assess and improve the pumping infrastructure, with a particular focus on protection against extreme weather events, such as the sudestadas in the Río de la Plata.
The scope of the project ranges from a thorough assessment of the current situation—including an evaluation of the existing infrastructure and its condition and operational status—to the proposal of specific measures to improve the system for cleaning and filtering stormwater flowing toward the pumping station.
In addition, the goal is to optimize gravity drainage in the Arroyo del Rey system – Carriego Relief Channel to facilitate drainage during minor events and maximize the forced discharge of stormwater through the retrofitting of civil works, the construction of new structures, or the adjustment of electromechanical systems.