
Drinking Water and Sewer System, West District
March 10, 2024
Drinking Water and Sewer System, Lot 5
March 10, 2024PROJECTS
Drinking Water and Sewer System, Lot 10
Project
Basic Design for the Rehabilitation of Drinking Water and Sewer Systems
Location
Tornquist, Tres Arroyos, Coronel Suárez, Argentina
Play
Basic Design for the Rehabilitation of Drinking Water and Sewer Systems – Lot 10 – South Central Region. National Directorate of Pre-Investment (DNPRI)
Details
The project involves the preparation of detailed design documents and bidding specifications for sewage and drinking water systems in eight localities in the Province of Buenos Aires, spread across six districts. Comprehensive designs were developed, including diagnostic studies and economic, environmental, and engineering assessments. For the towns of Claromecó, De La Garma, Huanguelén, Villa Ventana, and Sierra de la Ventana, sewer system designs were developed, serving a total population of 60,000 residents and comprising 170 km of PVC pipelines. In addition, pumping stations and sewage treatment plants were included, tailored to the specific needs of each location.
In General Lamadrid, Villa Serrana La Gruta, and Oriente, drinking water projects were carried out to serve a population of 14,000, including plans to expand water mains, build reverse osmosis treatment plants, and establish water supply and distribution systems.
ConsulTech
Do you need advice?





